Documents

 

https://www.azhk.kz/ru/corporate-governance/documents
Regulatory and Legal Framework

Law on Natural
Monopolies
Law on the National
Welfare Fund
Law on Joint Stock
Companies
Law on Electric
Power Industry
On the Approval of
the Technical
Regulation General
Requirements for
Fire Safety
On the Approval of
the Rules for the Use
of Electric Energy
On the Approval of
the Rules for the
Provision of Utility
Services in the
Almaty City
On the Approval of
the Rules for
Establishing
Protection Zones of
Electrical Network
Facilities
On Energy Saving
and Increasing
Energy Efficiency
Cost Estimate of
"AZhC" JSC for the
Installation of an
Individual Electric
Energy Meter for
Consumers in the
Almaty City and
Almaty Region
A Guide for
Employees Facing
Harassment at Work
 

https://www.azhk.kz/ru/corporate-governance/documents/79-dokumenty/2856-korporativnye-dokumenty
Corporate Documentsэ

Founding Documents

 Charter of "AZhC" JSC

Trademark Certificate 

Codes

Code of Conduct of "AZhC" JSC Corporate Governance Code

 

Policies and Regulations

Internal Control Process Regulation of «AZhC» JSC

Dividend Policy of "Samruk-Energy" JSC

Information Policy of «AZhC» JSC

HR Policy of «AZHC» JSC

Policy on Corporate Conflict Resolution and Conflict of Interest

CMS Policy of the Samruk-Energy Group of Companies

   

 

Provisions and Rules

Regulation on the Board of Directors of «AZhC» JSC

Regulation on the Board Members of «AZhC» JSC

Rules for Planning, Coordination, and Making Payments in "Samruk-Energy" JSC

 

Corporate Calendars

Corporate Events Calendar for 2022

Corporate Events Calendar for 2021

 

Annual Reports

Annual Report for 2021

Annual Report for 2020

 

https://www.azhk.kz/ru/corporate-governance/documents/79-dokumenty/2857-sistema-upravleniya-riskami

Risk Management System

Risk Management Policy of “Alatau Zharyk Company” JSC

Rules for Risk Identification and Assessment of “Alatau Zharyk Company” JSC (Supplement)

 

https://www.azhk.kz/ru/corporate-governance/documents/79-dokumenty/2858-finansovaya-otchetnost  

Financial Statements 

Financial Statements as of 30.09.2023

Financial Statements as of 30.06.2023

Financial Statements as of 31.03.2023

Excerpt from Protocol №02-23 dated 31.03, Report on FEA for the 2022

Excerpt from Protocol №04-23 dated 6.06.2023 (Report on FEA for 1st quarter  2023)

Protocol №07-22 dated 23.11.2022 (FEA for 9 months)

FEA for 1st quarter  2022. Protocol №05-22 dated 30.06.2022

FEA for the first half of 2022. Protocol No. 06-22 dated 27.08. 2022

Financial Statements in accordance with International Financial Reporting Standards and the Independent Auditor's Report as of 31.12.2022

Financial Statements as of 31.12.2022

Financial Statements as of 30.09.2022

Financial Statements as of 30.06.2022

Financial Statements as of 31.03.2022

Excerpt from Protocol №17 dated 17.05.2022

Financial Statements in accordance with International Financial Reporting Standards and the Independent Auditor's Report as of 31.12. 2021

Excerpt from Protocol №10 dated 31.12.2021

Financial Statements in accordance with International Financial Reporting Standards and the Independent Auditor's Opinion as of 31.12.2020

Excerpt from Protocol №11 dated 6.05.2020

Financial Statements in accordance with International Financial Reporting Standards and the Independent Auditor's Opinion as of 31.12.2019

Excerpt from Protocol №19 dated 27.06.2019

Excerpt from Protocol №15 dated 24.05.2019

Excerpt from Protocol №6 dated 23.04.2018

Condensed Interim Financial Statements (Unaudited) as of 30.06.2018

Financial Statements in accordance with International Financial Reporting Standards and the Independent Auditor's Opinion as of 31.12.2018

 

https://www.azhk.kz/ru/corporate-governance/documents/79-dokumenty/2859-investitsionnaya-programma

Инвестиционная программа

 

Information on the progress of the Investment Program of AZhC JSC for the 3rd quarter of 2023

 

Information on the progress of the Investment Program of AZhC JSC for the 2nd quarter of 2023

 

Information on the progress of the Investment Program of AZhC JSC for the 1st quarter of 2023

 

Information on the progress of the Investment Program of AZhC JSC for the 4th quarter of 2022

 

Information on the progress of the Investment Program of AZhC JSC for the 3rd quarter of 2022

Transfer of loads from the existing Substations №5A, № 17A, and №132A to the newly built Substation 110/10-10kV №163A "Otrar"

Reconstruction of the 6-10/0.4kV electrical networks of the Karasai DEN

Reconstruction of the 10/0.4 kV electrical networks of the Otegen Batyr DEN

Construction of the Substation 110/10kV "Kokozek" with connection to the  Open switchgear-110kV Substation-220kV "Kaskelen" in the Karasai district of the Almaty region

 

 

 

Information on the progress of the Investment Program of AZhC JSC for the 2nd quarter of 2022

 

Transfer of loads from the existing Substations №5A, № 17A, and №132A to the newly built Substation 110/10-10kV "Otrar"

Reconstruction and new construction of 10-6-0.4kV electrical networks at DEN-2, replacing overloaded and end-of-life cable lines to improve the reliability of electricity supply

Reconstruction and new construction of 10-6-0.4kVelectrical networks at DEN-4, replacing overloaded and end-of-life cable lines to improve the reliability of electricity supply

Construction of the Substation 110/10kV "Kokozek" with connection to the 110kV Switchgear of the Substation 220kV "Kaskelen" in the Karasai district of the Almaty region

 

 

 

Information on the progress of the Investment Program of AZhC JSC for the 1st quarter of 2022

 

 

Reconstruction of the 10/0.4kV electrical networks of the "Otegen Batyr" DEN, Reconstruction of the 6-10/0.4kV electrical networks of the Talgar DEN, Reconstruction of the 6-10/0.4kV electrical networks of the Karasai DEN

Reconstruction and new construction of 10-6-0.4kV electrical networks at DEN-2, replacing overloaded and end-of-life cable lines to improve the reliability of electricity supply

 

Reconstruction and new construction of 10-6-0.4kV electrical networks at DEN-4, replacing overloaded and end-of-life cable lines to improve the reliability of electricity supply

 

Transfer of loads from the existing Substation № 4 to the newly built Substation 110/10-10kV "Alatau"

 

 

 

Information on the progress of the Investment Program of AZhC JSC for the 4th quarter of 2021

Load transfer from Substation № 19A to the newly built Substation "Mamyr"

 

Conversion of 6kV networks to 10kV voltage at Substation №6A, Substation №3A (Substation №168A). Phase 1

 

Transfer of loads from the existing Substations №5A, №17A, and №132A to the newly built Substation 110/10kV "Otrar"

Reconstruction and new construction of 10-6-0.4kV electrical networks at DEN-2, replacing overloaded and end-of-life cable lines to enhance the reliability of the power supply

Reconstruction and new construction of 10-6-0.4kV electrical networks at DEN-4, replacing overloaded and end-of-life cable lines to enhance the reliability of the power supply

"Reconstruction of the 10/0.4kV electrical networks of the “Otegen Batyr” DEN", "Reconstruction of the 6-10/0.4kV electrical networks of the Talgar DEN", "Reconstruction of the 6-10/0.4kV electrical networks of the Karasai DEN"

Construction of the Substation 110/10kV "Kokozek" with connection to the Open Switchgear 110kV of the Substation 220kV "Kaskelen" in the Karasai district of the Almaty region

Information on the progress of the Investment Program of AZhC JSC for the 3rd quarter of 2021

"Conversion of 6kV networks to 10kV voltage at Substation №6A, Substation №3A (Substation №. 168). Phase 1".

"Construction of the Substation 110/10kV 'Kokozek' with connection to the Open Switchgear 110kV of the Substation 220kV 'Kaskelen' in the Karasai district of the Almaty region".

"Conversion of existing 6kV networks of Substations №6A 22A, 50A, 54A, 100A to 10kV voltage from the power lines-10kV of Substation №6A 150A 'Almaly' and from the newly built Substations 'Medeu' and 'Shymbulak'".

"Transfer of loads from the existing Substations №5A, №17A, and №132A to the newly built Substation 110/10kV №163A 'Otrar'".

     

Information on the progress of the Investment Program of AZhC JSC for the 2nd quarter of 2021

Conversion of existing 6kV networks of Substations №22A, 50A, 100A, 54A to 10kV voltage from the power lines-10kV of Substation №150A "Almaly" and from the newly built Substations "Medeu" and "Shymbulak"

Reconstruction and new construction of 10-6-0.4kV electrical networks, replacing overloaded and end-of-life cable lines to enhance the reliability at DEN-1

Reconstruction and new construction of 10-6-0.4kV electrical networks, replacing overloaded and end-of-life cable lines to enhance the reliability at DEN-6

Information on the progress of the Investment Program of AZhC JSC for the 1st quarter of 2021

 

 

Reconstruction and new construction of 10-6-0.4kV electrical networks, replacing overloaded and end-of-life cable lines to enhance the reliability at DEN-1

Reconstruction and new construction of 10-6-0.4kV electrical networks, replacing overloaded and end-of-life cable lines to enhance the reliability at DEN-6

 

Information on the progress of the Investment Program of AZhC JSC for the 4th quarter of 2020

 

 

Conversion of 6kV networks to 10kV voltage at Substation №6A, Substation №3A (Substation №168). Phase 1

Conversion of existing 6kV networks of Substations № 22, №50, №54, №100 to 10kV voltage from the power lines-10kV of Substation №150A Almaly and from the newly built Substations Medeu and Shymbulak

Reconstruction of 110kV overhead lines №102A, №105A, №109A, №120AI with replacement with composite wire and the entrance-exit of 110kV overhead line №120AI at Substation 220kV Besagash

"Reconstruction and new construction of 10-6-0.4kV electrical networks at DEN-1, DEN-6. Replacement of overloaded and end-of-life cable lines"

Reconstruction of 6kV network equipment DP-42 and conversion of 6kV networks DP-42 to increased voltage 10kV

   

Information on the progress of the Investment Program of AZhC JSC for the 3rd quarter of 2020

Conversion of 6kV networks to 10kV voltage at Substation №6A, Substation №3A (Substation №168)

Transfer of loads from the existing Substations №5A, №17A, and №132A to the newly built Substation 110/10kV "Otrar"

Reconstruction of 110kV overhead lines №102A№105A, №109A, №120AI with replacement with composite wire and the entrance-exit of overhead line-110kV №120AI at Substation 220/110/10kV №166A "Besagash"

Load transfer from Substation №19A to the newly built Substation "Mamyr"

Transfer of loads from the existing Substation №4 to the newly built Substation 110/10-10kV "Alatau"

Reconstruction of 6kV network equipment DP-42 and conversion of 6kV networks DP-42 to increased voltage 10kV

 

Information on the progress of the Investment Program of AZhC JSC for the 2nd quarter of 2020

Transfer of loads from the existing Substations №5A, №17A, and №132A to the newly built Substation 110/10kV "Otrar"

Reconstruction and new construction of 10-6-0.4kV electrical networks, replacing overloaded and end-of-life cable lines to enhance the reliability at DEN-1

Reconstruction of 110kV overhead lines №102A, №105A, №109A, №120AI with replacement with composite wire and the entrance-exit of overhead line-110kV №120AI at Substation 220kV "Besagash"

Transfer of loads from the existing Substation №4 to the newly built Substation 110/10-10kV "Alatau"

     

Information on the progress of the Investment Program of AZhC JSC for the 1st quarter of 2020

Project "Transfer of loads from the existing Substation №4 to the newly built Substation 110/10-10kV 'Alatau'"

Project "Reconstruction of 110kV overhead lines №102A, №105A, №109A, №120AI with replacement with composite wire and the entrance-exit of 110kV overhead line №120AI at Substation 220kV 'Besagash'"

 

Information on the progress of the Investment Program of AZhC JSC for the 4th quarter of 2019

Project "Transfer of loads from the existing Substation №4 to the newly built Substation 110/10-10kV 'Alatau'"

Project "Transfer of loads from the existing Substations №5A, №17A, and №132A to the newly built Substation 110/10kV 'Otrar'"

Project "Load transfer of Substation 220/110/10kV №131A 'Mountain Giant' to Substation 220/110/10kV №160A 'Ermensai' via 110kV networks with subsequent dismantling of Substation №131A"

Project "Reconstruction of 6kV network equipment DP-42 and conversion of 6kV networks DP-42 to increased voltage 10kV"

Project "Reconstruction of 110kV overhead lines №102A, №105A, № 109A, №120AI with replacement with composite wire and the entrance-exit of overhead line-110kV №120AI at Substation 220kV 'Besagash'"

   

Information on the progress of the Investment Program of AZhC JSC for the 3rd quarter of 2019

Project "Transfer of load from Substation №19A to the newly built Substation 'Mamyr'"

Project "Transfer of part of the loads from the existing Substation №4 to the newly built Substation 110/10kV 'Alatau'"

Project "Load transfer from Substation 220/110/10kV №131A 'Mountain Giant' to Substation 220/110/10kV №160A 'Ermensai' via 110kV networks with subsequent dismantling of Substation №131A"

Project "Conversion of existing 6kV networks of Substations №22A, №50A, №54A, №100A to 10kV voltage from the power lines-10kV of Substation №150A 'Almaly' and from the newly built Substations 'Medeu' and 'Shymbulak'"

Project "Reconstruction of electrical networks 10-0.4kV in the Almaty region with replacement of wires with SIW (self-supporting insulated wire)"

Project "Reconstruction, new construction of 0.4kV overhead lines at DEN-1, DEN-4, DEN-5, DEN-7 with conversion to self-supporting insulated wire"

 

Information on the progress of the Investment Program of AZhC JSC for the 2nd quarter of 2019

Project "Load transfer from Substation 220/110/10kV №131A 'Mountain Giant' to Substation 220/110/10kV №160A 'Ermensai' via 110kV networks with subsequent dismantling of Substation №131A"

Project "Reconstruction and new construction of 0.4kV overhead lines at DEN-1, DEN-4, DEN-5, DEN-7 with conversion to SIW SIW (self-supporting insulated wire). Construction and reconstruction of existing transformer substations to relieve overloaded transformer substations. Reconstruction of transformer substations that do not meet operational requirements 6-10/0.4kV and construction of new transformer substations 6-10/0.4kV"

 

Information on the progress of the Investment Program of AZhC JSC for the 1st quarter of 2019

Project "Load transfer from Substation 220/110/10kV №131A 'Mountain Giant' to Substation 220/110/10kV №160A 'Ermensai' via 110kV networks with subsequent dismantling of Substation №131A"

Project "Reconstruction and new construction of 0.4kV overhead lines at DEN-1, DEN-4, DEN-5, DEN-7 with conversion to SIW SIW (self-supporting insulated wire). Construction and reconstruction of existing transformer substations to relieve overloaded transformer substations. Reconstruction of transformer substations that do not meet operational requirements 6-10/0.4kV and construction of new transformer substations 6-10/0.4kV"

 

Information on the progress of the Investment Program of AZhC JSC for 11 months of 2018

Information on the progress of the Investment Program of AZhC JSC for 5 months of 2018

Information on the progress of the Investment Program of AZhC JSC for 2018

Information on the progress of the Investment Program of AZhC JSC for 11 months of 2017

Information on the progress of the Investment Program of AZhC JSC for 5 months of 2017

Information on the execution of the Investment Program of AZhC JSC for 2017

Information on the progress of the Investment Program of AZhC JSC for 11 months of 2016

Information on the progress of the Investment Program of AZhC JSC for 5 months of 2016

Information on the progress of the Investment Program of AZhC JSC for 2016

     

 

https://www.azhk.kz/ru/corporate-governance/documents/79-dokumenty/2860-tekhnicheskie-dokumenty

Технические документы

 

Information on the reserve, availability of free and accessible capacities, spaces, and network bandwidths of AZhC JSC

 

4th quarter 2023

3rd quarter 2023

2nd quarter 2023

1st quarter 2023

4th quarter 2022

3rd quarter 2022

2nd quarter 2022

1st quarter 2022

4th quarter 2021

3rd quarter 2021

0.4 kV Winter 2021

1st quarter 2021

Information on the existing loads of 6-10/0.4kV transformer substations on the balance sheet of AZhC JSC

4th quarter of 2020

3rd quarter of 2020

2nd quarter of 2020

1st quarter of 2020

4th quarter of 2019

3rd quarter of 2019

2nd quarter of 2019

1st quarter of 2019

4th quarter of 2018

3rd quarter of 2018

2nd quarter of 2018

1st quarter of 2018

4th quarter of 2017

3rd quarter of 2017

2nd quarter of 2017

1st quarter of 2017

2015

2016

 

 


Regional load profile for the Almaty power hub

 

January 2024

December 2023

November 2023

October 2023

September 2023

August 2023

July 2023

June 2023

April 2023

March 2023

February 2023

January 2023

December 2022

November 2022

October 2022

September 2022

August 2022

July 2022

June 2022

May 2022

April 2022

March 2022

February 2022

January 2022

December 2021

November 2021

October 2021

September 2021

August 2021

July 2021

June 2021

June 2021

May 2021

April 2021

March 2021

February 2021

January 2021

December 2020

November 2020

October 2020

September 2020

August 2020

July 2020

June 2020

May 2020

April 2020

March 2020

February 2020

January 2020

December 2019

November 2019

 

 

Network layout scheme for 35kV and above in Almaty city

Network layout scheme

Network layout scheme

 

Additional documents

TABLE of permissible loads on transformer equipment of AZhC JSC substations for 2021 in normal and emergency modes

Table of permissible loads for 35kV and above power lines of AZhC JSC in normal and emergency modes for 2021

 

 

 

 

 

 

   

 

 

 

 

 

 

"AZhK" JSC KINDLY REQUESTS PROMPT REPORTING, THROUGH A
CONVENIENT MEANS FOR YOU, OF ANY FACTS OF CORRUPTION IN THE
ACTIONS OF COMPANY EMPLOYEES
 Confidentiality and anonymity are guaranteed!
 Reports can be submitted by individuals in Russian, Kazakh, and English languages.
By call at 8 800 080 47 47 (Free call within the territory of Kazakhstan)
Through WhatsApp Messenger at +7 776 849 03 68
This email address is being protected from spambots. You need JavaScript enabled to view it.